Kit Material Logistics revisions

Bill and his team are going to start using the Kit Material Logistics functionality in MORK.  They have been relying on All Scheduled items report.
 
Here are a few things we would like to revise (For the most part the first ones are most important and the last are wish list):
 
·         What would it take to allow the information entered manually to stay with the course if it id deleted from the schedule and added back in?
·         The Book Quantity Projected doesn’t add Series participants to the individual workshop participants.  Can these be added?
·         Have an indicator that something was deleted – perhaps a grayed out version stays until rescheduled?
·         Could Ad-Hoc entries be made to MORk and shown here – example: “Send 2 minitab books to Nice-Pak” – not related to a course or project?
·         Add a “show time blocks” check box to display them\hide them
·         Multi-day events – can day 1 information be copied to the 2nd, 3rd days, etc
·         Printing – there are a couple of format issues to work through with Bill.
 
Jon P. Coy, PE

Open
v1
TBD
6365

Purdue University, 610 Purdue Mall, West Lafayette, IN 47907, (765) 494-4600

© 2015 Purdue University | An equal access/equal opportunity university | Copyright Complaints | Maintained by Technical Assistance Program

Trouble with this page? Disability-related accessibility issue? Please contact Technical Assistance Program at tap@purdue.edu.